OMEGA 2.3.0 session HDP2+ACT started at 2024-03-04 16:05:58

Initializing 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:
Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT Pass 0: Manufacturer=consolidated_OEM
Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2023  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2023 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2023 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.347777 / 0.323677 (DELTA:0.024100)
2023 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.000000 / 0.024100 (DELTA:0.024100)
2023 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2023 producer / consumer_abs_share_frac_pickup.ICE                    = 0.652223 / 0.650845 (DELTA:0.001378)
2023 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.000000 / 0.001378 (DELTA:0.001378)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $85996 / $85996 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $73880 / $73880 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $87260 / $87260 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $97755 / $97755 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $72646 / $72646 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $89822 / $89822 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $82246 / $85996 R:0.956393
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $73880 / $73880 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $83510 / $87260 R:0.957025
modified cross subsidized price / cost ALT pickup.BEV                 $94005 / $97755 R:0.961639
modified cross subsidized price / cost ALT pickup.ICE                 $72646 / $72646 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $86072 / $89822 R:0.958251

cross subsidized price / cost ALT BEV                                 $183751 / $183751 R:1.000000
cross subsidized price / cost ALT ICE                                 $73075 / $73075 R:1.000000
cross subsidized price / cost ALT PHEV                                $177082 / $177082 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $73881 / $73881 R:1.000000
cross subsidized price / cost ALT pickup                              $72647 / $72647 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73421 / $73421 R:1.000000

2023_0_0  SCORE:0.000918, CE:0.024100, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2024  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2024 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2024 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.346002 / 0.308735 (DELTA:0.037267)
2024 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.001390 / 0.038657 (DELTA:0.037267)
2024 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2024 producer / consumer_abs_share_frac_pickup.ICE                    = 0.649998 / 0.565724 (DELTA:0.084275)
2024 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.002610 / 0.086885 (DELTA:0.084274)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $79827 / $79827 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $68221 / $68221 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $84504 / $84504 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $100314 / $100314 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $75329 / $75329 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $89078 / $89078 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $75827 / $79827 R:0.949892
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $68221 / $68221 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $80504 / $84504 R:0.952665
modified cross subsidized price / cost ALT pickup.BEV                 $96314 / $100314 R:0.960125
modified cross subsidized price / cost ALT pickup.ICE                 $75329 / $75329 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $85078 / $89078 R:0.955096

cross subsidized price / cost ALT BEV                                 $180141 / $180141 R:1.000000
cross subsidized price / cost ALT ICE                                 $72860 / $72860 R:1.000000
cross subsidized price / cost ALT PHEV                                $87489 / $87489 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68287 / $68287 R:1.000000
cross subsidized price / cost ALT pickup                              $75385 / $75385 R:1.000000
cross subsidized price / cost ALT TOTAL                               $74684 / $74684 R:1.000000

2024_0_0  SCORE:0.056183, CE:0.084275, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2025  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2025 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2025 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.343139 / 0.308103 (DELTA:0.035036)
2025 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.004168 / 0.039203 (DELTA:0.035036)
2025 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2025 producer / consumer_abs_share_frac_pickup.ICE                    = 0.644861 / 0.559318 (DELTA:0.085544)
2025 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.007832 / 0.093376 (DELTA:0.085543)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $79384 / $79384 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $68161 / $68161 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $84116 / $84116 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $99419 / $99419 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $75226 / $75226 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $88618 / $88618 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $75134 / $79384 R:0.946463
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $68161 / $68161 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $79866 / $84116 R:0.949475
modified cross subsidized price / cost ALT pickup.BEV                 $95169 / $99419 R:0.957252
modified cross subsidized price / cost ALT pickup.ICE                 $75226 / $75226 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $84368 / $88618 R:0.952042

cross subsidized price / cost ALT BEV                                 $178804 / $178804 R:1.000000
cross subsidized price / cost ALT ICE                                 $72772 / $72772 R:1.000000
cross subsidized price / cost ALT PHEV                                $87055 / $87055 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68352 / $68352 R:1.000000
cross subsidized price / cost ALT pickup                              $75387 / $75387 R:1.000000
cross subsidized price / cost ALT TOTAL                               $74648 / $74648 R:1.000000

2025_0_0  SCORE:0.057029, CE:0.085544, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2026  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2026 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2026 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.341078 / 0.305905 (DELTA:0.035174)
2026 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.005899 / 0.041072 (DELTA:0.035174)
2026 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2026 producer / consumer_abs_share_frac_pickup.ICE                    = 0.641922 / 0.550790 (DELTA:0.091132)
2026 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.011101 / 0.102233 (DELTA:0.091131)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $77060 / $77060 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $68018 / $68018 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $82635 / $82635 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $94350 / $94350 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $75130 / $75130 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $86933 / $86933 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $72560 / $77060 R:0.941605
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $68018 / $68018 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $78135 / $82635 R:0.945544
modified cross subsidized price / cost ALT pickup.BEV                 $89850 / $94350 R:0.952305
modified cross subsidized price / cost ALT pickup.ICE                 $75130 / $75130 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $82433 / $86933 R:0.948236

cross subsidized price / cost ALT BEV                                 $171410 / $171410 R:1.000000
cross subsidized price / cost ALT ICE                                 $72662 / $72662 R:1.000000
cross subsidized price / cost ALT PHEV                                $85442 / $85442 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68267 / $68267 R:1.000000
cross subsidized price / cost ALT pickup                              $75331 / $75331 R:1.000000
cross subsidized price / cost ALT TOTAL                               $74469 / $74469 R:1.000000

2026_0_0  SCORE:0.060754, CE:0.091132, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2027  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2027 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2027 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.338000 / 0.306414 (DELTA:0.031586)
2027 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.010095 / 0.041681 (DELTA:0.031586)
2027 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2027 producer / consumer_abs_share_frac_pickup.ICE                    = 0.633000 / 0.545236 (DELTA:0.087764)
2027 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.018905 / 0.106669 (DELTA:0.087764)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $75878 / $75878 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67628 / $67628 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $81752 / $81752 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $91725 / $91725 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $74351 / $74351 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $85447 / $85447 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $71128 / $75878 R:0.937400
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67628 / $67628 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $77002 / $81752 R:0.941898
modified cross subsidized price / cost ALT pickup.BEV                 $86975 / $91725 R:0.948215
modified cross subsidized price / cost ALT pickup.ICE                 $74351 / $74351 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $80697 / $85447 R:0.944411

cross subsidized price / cost ALT BEV                                 $167604 / $167604 R:1.000000
cross subsidized price / cost ALT ICE                                 $72011 / $72011 R:1.000000
cross subsidized price / cost ALT PHEV                                $84161 / $84161 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68038 / $68038 R:1.000000
cross subsidized price / cost ALT pickup                              $74673 / $74673 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73783 / $73783 R:1.000000

2027_0_0  SCORE:0.058509, CE:0.087764, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2028  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2028 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2028 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.333456 / 0.303482 (DELTA:0.029974)
2028 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.013533 / 0.043506 (DELTA:0.029974)
2028 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2028 producer / consumer_abs_share_frac_pickup.ICE                    = 0.627544 / 0.540456 (DELTA:0.087088)
2028 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.025467 / 0.112555 (DELTA:0.087088)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $75073 / $75073 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67569 / $67569 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $81187 / $81187 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $89933 / $89933 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $74258 / $74258 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $84779 / $84779 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $70073 / $75073 R:0.933399
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67569 / $67569 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $76187 / $81187 R:0.938414
modified cross subsidized price / cost ALT pickup.BEV                 $84933 / $89933 R:0.944403
modified cross subsidized price / cost ALT pickup.ICE                 $74258 / $74258 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $79779 / $84779 R:0.941023

cross subsidized price / cost ALT BEV                                 $165006 / $165006 R:1.000000
cross subsidized price / cost ALT ICE                                 $71937 / $71937 R:1.000000
cross subsidized price / cost ALT PHEV                                $83532 / $83532 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68101 / $68101 R:1.000000
cross subsidized price / cost ALT pickup                              $74669 / $74669 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73714 / $73714 R:1.000000

2028_0_0  SCORE:0.058059, CE:0.087088, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2029  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2029 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2029 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.329406 / 0.301375 (DELTA:0.028031)
2029 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.016973 / 0.045004 (DELTA:0.028031)
2029 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2029 producer / consumer_abs_share_frac_pickup.ICE                    = 0.621594 / 0.536524 (DELTA:0.085070)
2029 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.032027 / 0.117097 (DELTA:0.085070)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $74335 / $74335 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67512 / $67512 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $80668 / $80668 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $88290 / $88290 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $74168 / $74168 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $84164 / $84164 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $69085 / $74335 R:0.929374
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67512 / $67512 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $75418 / $80668 R:0.934919
modified cross subsidized price / cost ALT pickup.BEV                 $83040 / $88290 R:0.940537
modified cross subsidized price / cost ALT pickup.ICE                 $74168 / $74168 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $78914 / $84164 R:0.937622

cross subsidized price / cost ALT BEV                                 $162625 / $162625 R:1.000000
cross subsidized price / cost ALT ICE                                 $71862 / $71862 R:1.000000
cross subsidized price / cost ALT PHEV                                $82953 / $82953 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68157 / $68157 R:1.000000
cross subsidized price / cost ALT pickup                              $74658 / $74658 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73625 / $73625 R:1.000000

2029_0_0  SCORE:0.056713, CE:0.085070, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2030  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2030 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2030 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.325524 / 0.299412 (DELTA:0.026112)
2030 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.020043 / 0.046155 (DELTA:0.026112)
2030 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2030 producer / consumer_abs_share_frac_pickup.ICE                    = 0.616476 / 0.534303 (DELTA:0.082173)
2030 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.037957 / 0.120130 (DELTA:0.082173)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $74264 / $74264 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67455 / $67455 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $80551 / $80551 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $88206 / $88206 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $74079 / $74079 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $84026 / $84026 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $68764 / $74264 R:0.925940
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67455 / $67455 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $75051 / $80551 R:0.931720
modified cross subsidized price / cost ALT pickup.BEV                 $82706 / $88206 R:0.937646
modified cross subsidized price / cost ALT pickup.ICE                 $74079 / $74079 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $78526 / $84026 R:0.934544

cross subsidized price / cost ALT BEV                                 $162470 / $162470 R:1.000000
cross subsidized price / cost ALT ICE                                 $71790 / $71790 R:1.000000
cross subsidized price / cost ALT PHEV                                $82825 / $82825 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68215 / $68215 R:1.000000
cross subsidized price / cost ALT pickup                              $74657 / $74657 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73590 / $73590 R:1.000000

2030_0_0  SCORE:0.054782, CE:0.082173, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2031  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2031 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2031 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.320970 / 0.297792 (DELTA:0.023178)
2031 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.023418 / 0.046597 (DELTA:0.023178)
2031 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2031 producer / consumer_abs_share_frac_pickup.ICE                    = 0.611029 / 0.534005 (DELTA:0.077025)
2031 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.044582 / 0.121607 (DELTA:0.077025)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $74139 / $74139 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67399 / $67399 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $80406 / $80406 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $87991 / $87991 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $73992 / $73992 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $83855 / $83855 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $68389 / $74139 R:0.922443
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67399 / $67399 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $74656 / $80406 R:0.928489
modified cross subsidized price / cost ALT pickup.BEV                 $82241 / $87991 R:0.934653
modified cross subsidized price / cost ALT pickup.ICE                 $73992 / $73992 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $78105 / $83855 R:0.931430

cross subsidized price / cost ALT BEV                                 $162130 / $162130 R:1.000000
cross subsidized price / cost ALT ICE                                 $71722 / $71722 R:1.000000
cross subsidized price / cost ALT PHEV                                $82668 / $82668 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68284 / $68284 R:1.000000
cross subsidized price / cost ALT pickup                              $74663 / $74663 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73527 / $73527 R:1.000000

2031_0_0  SCORE:0.051350, CE:0.077025, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2032  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2032 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2032 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.316846 / 0.296513 (DELTA:0.020333)
2032 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.026805 / 0.047138 (DELTA:0.020333)
2032 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2032 producer / consumer_abs_share_frac_pickup.ICE                    = 0.605154 / 0.532982 (DELTA:0.072172)
2032 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.051195 / 0.123367 (DELTA:0.072172)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $74255 / $74255 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67345 / $67345 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $80409 / $80409 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $88336 / $88336 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $73907 / $73907 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $83859 / $83859 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $68255 / $74255 R:0.919197
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67345 / $67345 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $74409 / $80409 R:0.925382
modified cross subsidized price / cost ALT pickup.BEV                 $82336 / $88336 R:0.932078
modified cross subsidized price / cost ALT pickup.ICE                 $73907 / $73907 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $77859 / $83859 R:0.928452

cross subsidized price / cost ALT BEV                                 $162591 / $162591 R:1.000000
cross subsidized price / cost ALT ICE                                 $71652 / $71652 R:1.000000
cross subsidized price / cost ALT PHEV                                $82674 / $82674 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68364 / $68364 R:1.000000
cross subsidized price / cost ALT pickup                              $74683 / $74683 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73496 / $73496 R:1.000000

2032_0_0  SCORE:0.048114, CE:0.072172, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2033  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2033 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2033 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.312295 / 0.294831 (DELTA:0.017464)
2033 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.030134 / 0.047598 (DELTA:0.017464)
2033 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2033 producer / consumer_abs_share_frac_pickup.ICE                    = 0.599705 / 0.545028 (DELTA:0.054677)
2033 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.057866 / 0.112543 (DELTA:0.054676)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $74607 / $74607 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67291 / $67291 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $80556 / $80556 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $89232 / $89232 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $73823 / $73823 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $84033 / $84033 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $74607 / $74607 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67291 / $67291 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $80556 / $80556 R:1.000000
modified cross subsidized price / cost ALT pickup.BEV                 $89232 / $89232 R:1.000000
modified cross subsidized price / cost ALT pickup.ICE                 $73823 / $73823 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $84033 / $84033 R:1.000000

cross subsidized price / cost ALT BEV                                 $163839 / $163839 R:1.000000
cross subsidized price / cost ALT ICE                                 $71586 / $71586 R:1.000000
cross subsidized price / cost ALT PHEV                                $82842 / $82842 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68459 / $68459 R:1.000000
cross subsidized price / cost ALT pickup                              $74722 / $74722 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73367 / $73367 R:1.000000

2033_0_0  SCORE:0.036451, CE:0.054677, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2034  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2034 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2034 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.308181 / 0.292141 (DELTA:0.016040)
2034 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.033105 / 0.049145 (DELTA:0.016040)
2034 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2034 producer / consumer_abs_share_frac_pickup.ICE                    = 0.594819 / 0.545756 (DELTA:0.049063)
2034 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.063895 / 0.112958 (DELTA:0.049063)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $74151 / $74151 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67239 / $67239 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $80226 / $80226 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $88231 / $88231 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $73741 / $73741 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $83643 / $83643 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $74151 / $74151 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67239 / $67239 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $80226 / $80226 R:1.000000
modified cross subsidized price / cost ALT pickup.BEV                 $88231 / $88231 R:1.000000
modified cross subsidized price / cost ALT pickup.ICE                 $73741 / $73741 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $83643 / $83643 R:1.000000

cross subsidized price / cost ALT BEV                                 $162382 / $162382 R:1.000000
cross subsidized price / cost ALT ICE                                 $71522 / $71522 R:1.000000
cross subsidized price / cost ALT PHEV                                $82477 / $82477 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68499 / $68499 R:1.000000
cross subsidized price / cost ALT pickup                              $74701 / $74701 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73279 / $73279 R:1.000000

2034_0_0  SCORE:0.032709, CE:0.049063, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2035  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2035 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2035 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.304139 / 0.290005 (DELTA:0.014134)
2035 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.036442 / 0.050576 (DELTA:0.014134)
2035 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2035 producer / consumer_abs_share_frac_pickup.ICE                    = 0.588861 / 0.547175 (DELTA:0.041686)
2035 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.070558 / 0.112244 (DELTA:0.041686)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $73717 / $73717 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67187 / $67187 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $79912 / $79912 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $87281 / $87281 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $73660 / $73660 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $83272 / $83272 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $73717 / $73717 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67187 / $67187 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $79912 / $79912 R:1.000000
modified cross subsidized price / cost ALT pickup.BEV                 $87281 / $87281 R:1.000000
modified cross subsidized price / cost ALT pickup.ICE                 $73660 / $73660 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $83272 / $83272 R:1.000000

cross subsidized price / cost ALT BEV                                 $160998 / $160998 R:1.000000
cross subsidized price / cost ALT ICE                                 $71455 / $71455 R:1.000000
cross subsidized price / cost ALT PHEV                                $82128 / $82128 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68549 / $68549 R:1.000000
cross subsidized price / cost ALT pickup                              $74688 / $74688 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73178 / $73178 R:1.000000

2035_0_0  SCORE:0.027791, CE:0.041686, CSPE:0.000000

Running 2024_03_04_15_53_26_MD_FRM_sensitivity_noBEVs_20240304_HDP2+ACT:  Year=2036  Iteration=0 consolidated_OEM
%%% consumer cuv_suv_van shares constrained %%%
%%% consumer pickup shares constrained %%%

2036 producer / consumer_abs_share_frac_cuv_suv_van.BEV               = 0.000000 / 0.000000 (DELTA:0.000000)
2036 producer / consumer_abs_share_frac_cuv_suv_van.ICE               = 0.303285 / 0.287492 (DELTA:0.015793)
2036 producer / consumer_abs_share_frac_cuv_suv_van.PHEV              = 0.036340 / 0.052132 (DELTA:0.015793)
2036 producer / consumer_abs_share_frac_pickup.BEV                    = 0.000000 / 0.000000 (DELTA:0.000000)
2036 producer / consumer_abs_share_frac_pickup.ICE                    = 0.589715 / 0.545392 (DELTA:0.044323)
2036 producer / consumer_abs_share_frac_pickup.PHEV                   = 0.070660 / 0.114983 (DELTA:0.044323)

cross subsidized price / cost ALT cuv_suv_van.BEV                     $73499 / $73499 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.ICE                     $67137 / $67137 R:1.000000
cross subsidized price / cost ALT cuv_suv_van.PHEV                    $79720 / $79720 R:1.000000
cross subsidized price / cost ALT pickup.BEV                          $86857 / $86857 R:1.000000
cross subsidized price / cost ALT pickup.ICE                          $73580 / $73580 R:1.000000
cross subsidized price / cost ALT pickup.PHEV                         $83049 / $83049 R:1.000000

modified cross subsidized price / cost ALT cuv_suv_van.BEV            $73499 / $73499 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.ICE            $67137 / $67137 R:1.000000
modified cross subsidized price / cost ALT cuv_suv_van.PHEV           $79720 / $79720 R:1.000000
modified cross subsidized price / cost ALT pickup.BEV                 $86857 / $86857 R:1.000000
modified cross subsidized price / cost ALT pickup.ICE                 $73580 / $73580 R:1.000000
modified cross subsidized price / cost ALT pickup.PHEV                $83049 / $83049 R:1.000000

cross subsidized price / cost ALT BEV                                 $160356 / $160356 R:1.000000
cross subsidized price / cost ALT ICE                                 $71392 / $71392 R:1.000000
cross subsidized price / cost ALT PHEV                                $81918 / $81918 R:1.000000
cross subsidized price / cost ALT cuv_suv_van                         $68483 / $68483 R:1.000000
cross subsidized price / cost ALT pickup                              $74593 / $74593 R:1.000000
cross subsidized price / cost ALT TOTAL                               $73136 / $73136 R:1.000000

2036_0_0  SCORE:0.029549, CE:0.044323, CSPE:0.000000

Simulation elapsed time 258.23
HDP2+ACT: Post Processing ...

Session ended at 2024-03-04 16:09:56
Session elapsed time 264.98 seconds


Session Complete