Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Emergency

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2025. This website is no longer updated and links to external websites and some internal pages may not work. More information »

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Climate Change
    • Emergency Response
    • Environmental Information by Location
    • Environmental Justice
    • Greener Living
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History
    • Staff Directory

Breadcrumb

  1. Home
  2. Permitting Under the Clean Air Act

Alabama Proposed Title V Permits

EPA is updating the Electronic Permitting System. Throughout the transition, permit actions will be uploaded to this page weekly beginning the week of 1/6/25 until the new public dashboard is available. The first table was last updated on 1/14/25. The second table stopped updating on 12/13/24. Please direct any questions to akers.brad@epa.gov.
 
Facility Name Permitting Authority Permit Number Title V Permit Action Submission Category Public Notice Period End of EPA 45-day Review Petition Period Files 
Stella Jones Corporation Brierfield  ADEM  401-0011  Renewal  Draft/Proposed for Concurrent Review  1/8/2025 – 2/7/2025  2/24/2025  2/25/2025 – 4/28/2025 

Draft/Proposed Permit (pdf) (590.34 KB)

Public Notice (pdf) (57.7 KB)

Statement of Basis (pdf) (119 KB)

Kith Kitchen, LLC ADEM 710-0016  Renewal  Draft/Proposed for Concurrent Review  1/3/2025 - 2/3/2025   2/18/2025  2/19/2025 - 4/21/2025  

710-0016 Statement of Basis (pdf) (167.94 KB)

710-0016 TV Permit (pdf) (1.3 MB)

710-0016 Public Notice (pdf) (479.92 KB)

710-0016 Application Summary (pdf) (28.57 KB)

Southern Natural Gas Company-Elmore Compressor Station  ADEM 205-0006  Renewal  Draft/Proposed for Concurrent Review  12/20/2024-1/20/2025   2/3/2025  2/4/2025-4/7/2025  205-0006 Statement of Basis (pdf) (505.71 KB)

205-0006 Application Summary (pdf) (211.25 KB)

205-0006 Public Notice (pdf) (149.01 KB)

205-0006 Draft/Proposed Permit (pdf) (1.18 MB)

The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review. To find out which permits have been targeted for EPA Region 4 review, please contact the Region 4 staff person(s) listed at the bottom of this page.

Return to Region 4 Proposed Title V Permits and State Contacts

Instructions for Table: Scroll to the right to view the petition period and the associated files. Click on the title of any column to sort by that column. Users can also use the "Select Columns" button to change or narrow down what columns are displayed.  Use the "Filter rows by text" box to search for specific key words. Click on the "View Files" button in the far right column to view the permit documents in the public docket.

 

For information about the contents of this page please contact Lindsay Averett.


As of August 14, 2020, the table of permitting actions on this page is dynamically linked to EPA's national Electronic Permit System (EPS). Permitting actions appear in the table in real time as soon as they are entered into the EPS database, typically on a weekly basis.

  • Return to Region 4 Proposed Title V Permits and State Contacts
Contact Us About Permitting Under the Clean Air Act to ask a question, provide feedback, or report a problem.
Last updated on January 14, 2025
  • Assistance
  • Ayuda
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • Aide
  • Asistans
  • Korean
  • Assistência
  • Russian
  • Tulong
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions

Follow.