Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Emergency

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2025. This website is no longer updated and links to external websites and some internal pages may not work. More information »

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Climate Change
    • Emergency Response
    • Environmental Information by Location
    • Environmental Justice
    • Greener Living
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History
    • Staff Directory

Breadcrumb

  1. Home
  2. Red Hill

October 2016 TIRM Report List of Appendices

Return to: Tank Inspection, Repair and Maintenance

Appendices to the October 2016 Red Hill Administrative Order on Consent (AOC) Statement of Work (SOW) Tank Inspection, Repair & Maintenance (TIRM) Report.

Free viewers and readers are available to access documents on our website. If you encounter issues with assistive technology, please contact us.

Red Hill AOC SOW TIRM Report: List of Appendices (pdf) (36.29 KB, October 11, 2016)
List of appendices to the Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report.

Red Hill AOC SOW TIRM Report: Appendices A-I (pdf) (15.39 MB, January 2007)

  • A: Telltale Piping Holes
  • B: Red Hill Dome Truss Scaffold
  • C: Red Hill Monorail Scaffold
  • D: Boom and Basket System
  • E: API 653 Inspection Report Tank 13 July 1995
  • F: API 653 Inspection Report Tank 10 1998
  • G: API 653 Report Tank 7 1998
  • H: API 653 Report Tank 8 1998
  • I: Contract Number FA8903-04-D-8681-0176-All

Red Hill AOC SOW TIRM Report: Appendix J (pdf) (81.45 MB, January 2007)
Appendix J to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Tank 16 Final API 653 Inspection Report.

Red Hill AOC SOW TIRM Report: Appendix K (pdf) (80.05 MB, January 2007)
Appendix K to the Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: FINAL Tank 6 API 653 Inspection Report.

Red Hill AOC SOW TIRM Report: Appendix L (pdf) (70.68 MB, January 2007)
Appendix L to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Tank 15 API 653 Inspection Report.

Red Hill AOC SOW TIRM Report: Appendices M-Q (pdf) (40.7 MB, October 2016)

  • M: Contract Number N47408-04-D-8503-0031-All
  • N: API 653 Inspection Tank 2 2008
  • O: API 653 Inspection Tank 20 2008
  • P: Contract Number N62583-09-D-0132-0003-All
  • Q: WGS Daily Production Report Tanks 5 and 17

Red Hill AOC SOW TIRM Report: Appendix R (pdf) (36.31 MB, May 2010)
Appendix R to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Tanks 5 and 17 Cleaning, Inspection and Repairs Project Execution Work Plan.

Red Hill AOC SOW TIRM Report: Appendix S (pdf) (167.27 KB, October 2010)
Appendix S to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Willbros Government Services, LLC (WGS) Request for Information/Clarification (RFI) re: RFI6 Pressure Washing.

Red Hill AOC SOW TIRM Report: Appendix T (pdf) (88.06 MB, November 2010)
Appendix T to the 2016 Red Hill AOC SOW Tank Inspection, Repair & Maintenance (TIRM) Report: Willbros Government Services, LLC (WGS) Tank 5 Inspection Report.

Red Hill AOC SOW TIRM Report: Appendices U-X (pdf) (44 MB, October 2016)

  • U: CSI Services – Daily Coating Inspection Report
  • V: WGS Work Plan – Abrasive Blasting and Surface Preparation 2012
  • W: WGS Warranty Work Plan
  • X: NAVFAC Drawing No. 7019545 MILCON P-060 coating details

Appendix Y: Not Used

Appendix Z: Not Used

Red Hill AOC SOW TIRM Report: Appendices AA-AG (pdf) (14.19 MB, August 2014)

  • AA: WGS Analysis Hydro Report
  • AB: WGS Redhill Complex TK 5 Project – Pressure Test Log
  • AC: Willbros D0132 DO 3 Red Hill mod 9
  • AD: WGS ASNT Records
  • AE: Tank 5 Inspection Checklist
  • AF: FY-78 MILCON P-060 Scope of Work
  • AG: WGS Weld WPS and PQR

Red Hill AOC SOW TIRM Report: Appendices AH-AS (pdf) (39.89 MB, October 2016)

  • AH: WGS WPQ Records
  • AI: WGS Daily Report 01-16-13 Rev 0
  • AJ: Tank 5 Warranty notice
  • AK: Notice to Proceed Oct 2014
  • AL: TK 5 Visual Inspection Report Signed
  • AM: TK 5 MT-LT Inspection Report
  • AN: WGS Tank 5 Work Plan Appendix M
  • AO: WGS Free Product Report
  • AP: WGS Tank 5 Pressure Testing Procedure Jun 2014
  • AQ: WGS Tank 5 Pressure Testing Report Jun 2014
  • AR: QASP RHT5 Warranty Rework
  • AS: WGS Tank 5 Suitability For Service Statement

Red Hill AOC SOW TIRM Report: Appendix AT (pdf) (36.6 MB, April 2010)

Red Hill AOC SOW TIRM Report: Appendices AU-BP (pdf) (35.49 MB, October 2016)

  • AU: WGS D-0132 Basic Award
  • AV: WGS Sample and Drain Line Drawings
  • AW: WGS Tank 5 Repairs – Repair NDE QC Data
  • AX: List of Welder PQR
  • AY: API Inspector Qualifications
  • AZ: NAVSUP GLS Instruction 10345.1 – Fuel Tank Return to Service
  • BA: Contract Number N62742-03-C-1402-All
  • BB: Red Hill Tank 5 Inspection SOW
  • BC: Generic 653 SOW April2010
  • BD: UFGS Section 33 56 17.00 20
  • BE: UFGS Section 33 56 18.00 20
  • BF: Telltale Leak Detection System
  • BG: DLA ATG Policy Letter 2009
  • BH: NAVSEA 5104 14 August 2011 RSO Application
  • BI: NAVFACINST 5104 1
  • BJ: Report on the Trip to Pacific Division Naval Facilities Command
  • BK: Acquisition Schedule Red Hill CIR
  • BL: Overall CIR Schedule without modification
  • BM: Red Hill Tank CIR Contract Sequencing
  • BN: Contract Number N39430-15-D-1632-0005 Tanks 14, 17, 18
  • BO: Contract Number N39430-15-D-1632-0004 Tanks 4, 13
  • BP: NAVFAC Drawing No. 7019544 MILCON P-060

Red Hill

  • About Red Hill
    • About the Fuel Releases
    • Frequently Asked Questions
  • Defueling Plan and Closure
  • Drinking Water Quality
  • Environmental Investigation and Remediation
    • Groundwater Results Application
    • 2015 Administrative Order
  • Inspections and Enforcement
    • 2023 Consent Order
      • Community Representation Initiative
    • 2015 Administrative Order
      • Parties to the Agreement
      • Investigation and Remediation
      • - Fuel Releases
      • - Groundwater Flow Patterns
      • - Groundwater Monitoring
      • Tank Infrastructure Improvements
      • - Corrosion and Metal Fatigue Practices
      • - Release Detection
      • - Risk and Vulnerability Assessment
      • - Tank Inspection, Repair and Maintenance
      • - Tank Upgrade Alternatives
      • Additional Documents
      • Remediation Roundtable
    • Drinking Water Quality
    • Spill Prevention and Underground Storage Inspections
    • Fire Suppressant (“AFFF”) Spill
    • Defueling Plan and Closure
  • Public Engagement
    • Email Distribution List
    • Calendar of Events
    • Webinars
    • Community Representation Initiative (2023 Order)
    • Remediation Roundtable (2015 AOC)
Contact Us
Contact Us to ask a question, provide feedback, or report a problem.
Last updated on April 15, 2024
  • Assistance
  • Ayuda
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • Aide
  • Asistans
  • Korean
  • Assistência
  • Russian
  • Tulong
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions

Follow.