Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Emergency

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2025. This website is no longer updated and links to external websites and some internal pages may not work. More information »

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Climate Change
    • Emergency Response
    • Environmental Information by Location
    • Environmental Justice
    • Greener Living
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History
    • Staff Directory

Breadcrumb

  1. Home
  2. Underground Injection Control (UIC)

Requirements for all Class I Wells and Class I Hazardous Waste Wells

There are a common set of requirements for all Class I wells and Class I hazardous waste wells. The common requirements are categorized by:

  • Siting - Demonstrates fluids are injected into a formation that is below the lowermost formation containing a USDW, and within 1/4 mile of a well.
  • Construction - Requires a multilayered design to prevent fluids from entering USDWs.
  • Operation, monitoring, and testing - Ensures multiple safeguards to ensure the injected wastewater is fully confined. 
  • Record keeping and reporting - Ensures that there are no leaks in the casing, tubing, or packer and that the injected fluid is contained within the injection zone. 
  • Closure - Informs the UIC program about the operation of the well and all testing results. 
  • Requirements for Class I Wells and Class I Hazardous Wells (pdf) (31.46 KB)
    A summary of the requirements for Class I and Class I hazardous waste wells.

Underground Injection Control (UIC)

  • Class I Industrial and Municipal Waste Disposal Wells
  • Class II Oil and Gas Related Injection Wells
  • Class III Injection Wells for Solution Mining
  • Class IV Shallow Hazardous and Radioactive Injection Wells
  • Class V Wells for Injection of Non-Hazardous Fluids into or Above Underground Sources of Drinking Water
  • Class VI Wells Used for Geologic Sequestration of CO2
Contact Us About Underground Injection Control
Contact Us About Underground Injection Control to ask a question, provide feedback, or report a problem.
Last updated on April 3, 2024
  • Assistance
  • Ayuda
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • Aide
  • Asistans
  • Korean
  • Assistência
  • Russian
  • Tulong
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions

Follow.