Skip to main content
U.S. flag

An official website of the United States government

Here’s how you know

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock (LockA locked padlock) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Emergency

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2025. This website is no longer updated and links to external websites and some internal pages may not work. More information »

    • Environmental Topics
    • Air
    • Bed Bugs
    • Cancer
    • Chemicals, Toxics, and Pesticide
    • Climate Change
    • Emergency Response
    • Environmental Information by Location
    • Environmental Justice
    • Greener Living
    • Health
    • Land, Waste, and Cleanup
    • Lead
    • Mold
    • Radon
    • Research
    • Science Topics
    • Water Topics
    • A-Z Topic Index
    • Laws & Regulations
    • By Business Sector
    • By Topic
    • Compliance
    • Enforcement
    • Laws and Executive Orders
    • Regulations
    • Report a Violation
    • Environmental Violations
    • Fraud, Waste or Abuse
    • About EPA
    • Our Mission and What We Do
    • Headquarters Offices
    • Regional Offices
    • Labs and Research Centers
    • Planning, Budget, and Results
    • Organization Chart
    • EPA History
    • Staff Directory

Breadcrumb

  1. Home
  2. Permitting Under the Clean Air Act

CAA Permits Issued by EPA in Region 2

EPA's Region 2 serves New Jersey, New York, Puerto Rico, the U.S. Virgin Islands and 8 Tribal Nations

Current Actions:  None
On this page:
 
  • Prevention of Significant Deterioration (PSD) Permits
  • Pending PSD Permits
  • Plantwide Applicability Limitation (PAL) Permits
  • Plantwide Applicability Limitation (PAL) Pending Permits
  • Part 71 Permits
  • Pending Part 71 Permits
  • Outer Continental Shelf (OCS) Permits
  • Pending OCS Permits
  • Deepwater Port Permits

Prevention of Significant Deterioration (PSD) Permits (issued since 2000)

Facility and Location Facility Type/Project Description Permit Type Permit Documents Issued
AbbVie Ltd., Barceloneta, PR  AbbVie Ltd., is a pharmaceutical facility located in Barceloneta, PR. This amendment to the 1992 issued PSD permit includes: (1) increase in the hours of operation for the cogeneration diesel engine; (2) decrease of the power generation capacity of the cogeneration diesel engine; (3) decrease in the maximum allowable sulfur content limit of the No.6 fuel oil fired in the cogeneration diesel engine; and (4) removal of three 50 MMBTU/hr boilers from the PSD permit.  Administrative Amendment

Final Permit  (PDF, 3mb)

11/09/2017

Energy Answers Arecibo, LLC/Energy Answers Arecibo
Puerto Rico Renewable Energy Project, PR

A new resource recovery facility capable of generating 77 MW. The facility includes two identical municipal solid waste combustors (i.e., spreader-stoker boilers), a steam turbine-electrical-generator, ash handling system, emergency diesel-generator and fire pump, a “four-cell” cooling tower, and carbon and lime storage silos. The two combustors will be fueled, primarily, by 2,106 tons per day of refuse-derived municipal solid waste. The combustors’ supplementary fuels (used to substitute for a portion of refuse-derived fuel) comprise of auto-shredder residue, tire-derived fuel, and processed urban wood waste.
The air pollution control equipment comprises of Regenerative Selective Catalytic Reduction system, Oxidation Catalyst,
Fabric Filter systems, Turbosorp circulating dry scrubber with lime injection, and Activated carbon injection system. 

New

Final Permit (PDF, 553kb)

4/10/2014

Energy Answers Arecibo, LLC/Energy Answers Arecibo
Puerto Rico Renewable Energy Project, PR
  Extension Final PSD Permit Extension Letter 10/01/2015
Energy Answers Arecibo, LLC/Energy Answers Arecibo
Puerto Rico Renewable Energy Project, PR
  Extension Final PSD Permit Extension Letter 04/10/2017
Virgin Islands Water and Power Authority - Units 16, 17, 19 and 20
St. Croix, VI
Electric Power Generation/Permit revisions for the existing gas turbines. Modification Final Permit (PDF, 277kb) 11/27/2000
Virgin Islands Water and Power Authority - Units 16, 17, 19 and 20
St. Croix, VI
Electric Power Generation/Permit revisions for the existing gas turbines: to remove the requirement to operate COMs and to require compliance with the SIP's Opacity limits Modification Final Permit (PDF, 13mb) 7/08/2016
Virgin Islands Water and Power Authority - Unit 22, at the Krum Bay Facility
St. Thomas, VI
Electric Power Generation/Installation of a new 24 MW simple cycle oil fired gas turbine. New Final Permit (PDF, 1,306kb) 1/03/2001
AES Puerto Rico, L.P.
Guayama, PR
Electric Power Generation/Corrections of the parts per million emission limits for the existing coal fired circulating fluidized bed boiler. Administrative Amendment Final Permit (PDF, 1,093kb) 10/29/2001
Puerto Rico Electric and Power Authority- San Juan Combined Cycle Project
San Juan, PR
Electric Power Generation/ Installation of two (2) new 476 MW combined cycle oil fired turbines. New Final Permit (PDF, 2,389kb) 4/01/2004
Nucor Steel Auburn, Inc.
Auburn, NY
Steel Plant/Increasing the melt shop production limits; Replacing the existing rolling mill reheat furnace with a new 179 MMBTU/hr reheat furnace. Modification Final Permit (PDF, 192kb) 6/22/2004
AES Puerto Rico, L.P.
Guayama, PR
Electric Power Generation/Permit revisions for the existing coal fired fluidized bed boiler. Administrative Amendment Final Permit (PDF, 339kb) 8/10/2004
Virgin Islands Water and Power Authority - Unit 23, at the Krum Bay
St. Thomas, VI
Electric Power Generation/ Installation of a new 39 MW simple cycle oil fired combustion turbine New  Final Permit (PDF, 299kb) 9/08/2004
Virgin Islands Water and Power Authority - Unit 23, at the Krum Bay
St. Thomas, VI
Electric Power Generation/Permit revisions for the existing gas turbine Unit 23: to remove the requirement to operate COMs and to require compliance with the SIP’s Opacity limits. Modification Final Permit (PDF, 7mb) 7/08/2016
American Re-Fuel Company of Hempstead
Westbury, NY
Resource Recovery Facility/Increasing the annual throughput of municipal waste for the three existing waste-to-energy boilers. Modification Final Permit (PDF, 228kb) 11/15/2004
EcoElectrica, L.P.
Peñuelas, PR
Liquefied Natural Gas (LNG) Import Terminal and Electric Power Generation/ Permit revisions for the existing combined cycle natural gas combustion turbines and for the auxiliary diesel generators. Administrative Amendment Final Permit (PDF, 1,984kb) 2/11/2005
EcoElectrica, L.P.
Peñuelas, PR
Liquefied Natural Gas (LNG) Import Terminal and Electric Power Generation/ This amendment to the PSD permit issued on 2/11/2005 includes the replacement of certain components of two existing combined-cycle gas turbines. These changes will reduce air leakage, increase compressor power, increase heat rate, and allow increases in electricity generation without increasing the fuel usage of the turbines and duct burners. Administrative Amendment Final Permit (PDF, 9mb) 3/13/2018
Trigen–Nassau Energy Corporation
Uniondale, NY
Electric Power Generation/ Installation of a new 79.9 MW combined cycle natural gas fired combustion turbine. New Final Permit (PDF, 1,054kb) 3/31/2005
Caithness Long Island, LLC
Brookhaven, NY
Electric Power Generation/ Installation of a new 346 MW combined cycle natural gas fired combustion turbine. New

Final Permit (PDF, 376kb)

Fact Sheet

4/07/2006
Caithness Long Island, LLC
Brookhaven, NY
Electric Power Generation/ Installation of a new 346 MW combined cycle natural gas fired combustion turbine. Modification

Final Permit (PDF, 409 K)

Fact Sheet

8/19/2020
Caithness Long Island, LLC
Brookhaven, NY
 
Electric Power Generation/ Installation of a new 346 MW combined cycle natural gas fired combustion turbine.

Modification
 

Cover Letter Final Permit (pdf) (278.51 KB)

Final Permit (pdf) (230.4 KB)

FACT SHEET (pdf) (1.01 MB)

2/16/2023
Puerto Rico Electric and Power Authority(PREPA) Cambalache Plant
San Juan, PR
Electric Power Generation/Permit revisions for the existing combined cycle distilled oil fired combustion turbines(i.e. removing the SCR system due to the increase in ammonia production) Modification Final Permit (PDF, 388kb) 7/05/2006
CEMEX de Puerto Rico, Inc.
San Juan, PR
Portland Cement Plant/Substitutes up to a maximum of 20% of the heat required for the cement manufacturing process, currently generated by coal, with biomass, such as vegetative materials, wood chips, and biofuels. Administrative Amendment Final Permit (PDF, 3 MB) 11/29/2012
Besicorp-Empire Power Company, LLC
Rensselaer, NY
Electric Power Generation/Extending the existing PSD expiration date that was issued for the construction of a 505 MW combined cycle natural gas fired combustion turbine. Extension Final Permit (PDF, 271kb) 5/17/2007
Besicorp- Empire Newsprint, LLC
Rensselaer, NY
Paper Recycling/Extending the existing PSD expiration date that was issued for the construction of a 330,000 metric ton-per-year recycled newsprint facility. Extension Final Permit (PDF, 265kb) 5/17/2007
HOVENSA, LLC
St. Croix, VI
GT-10 – A modification to the monitoring of GT-10. The earlier 2004 permit contains the requirement to install and utilize the CEM system based on stack gas volumetric flow rates. HOVENSA is requesting the permit be revised to require the use of calibrated fuel flow meters in conjunction with the existing CEMS Administrative Amendment Final Permit (PDF, 528kb) 8/15/2007
Cornell University
Ithaca, NY
Combined Heat and Power/ Installation of two (2) new 8 MW combined cycle natural gas fired combustion turbines. New Final Permit (PDF, 202kb) 6/03/2008
HOVENSA, LLC
St. Croix, VI
Modification to 1997 Permit - Petroleum Refinery/Replacing an existing low NOx "Converter Heater" with a new ultra-low NOx "Converter Heater" for their existing Acid Plant. Modification Final Permit (PDF, 6Mb) 5/09/2011
HOVENSA, LLC
St. Croix, VI
GT 13/LSF Permit – Modified - Petroleum Refinery/Lowering the NOx emission limit for the combustion turbine, while firing fuel oil. Modification Final Permit (PDF, 1Mb) 8/17/2011
Virgin Island Water and Power Authority-Unit 18, at the Krum Bay Facility
St. Thomas, VI
Electric Power Generation/Revision of the volatile organic compounds (VOC) parts per million (ppm) limit for the existing Unit 18. Administrative Amendment Final Permit (PDF, 8mb) 12/21/2015
Virgin Island Water and Power Authority- Unit 15, 18, and 22 at the Krum Bay St. Thomas, VI Electric Power Generation/Permit revisions for the existing gas turbines Units 15, 18, and 22: to remove the requirement to operate COMs and to require compliance with the SIP’s Opacity limits Modification Final Permit (PDF, 13mb) 7/08/2016

Plantwide Applicability Limitation (PAL) Permits

Facility and Location Facility Type/Project Description Permit Type Permit Documents Issued

Limetree Bay Terminals and Limetree Bay Refining

St. Croix, VI

The Limetree Bay Terminals and Limetree Bay Refining facility (“Limetree”) is a complex, integrated petroleum refinery consisting of refinery process units and various supporting operations including sulfur recovery plants, steam and electric power generation via boilers and gas turbine cogeneration units, wastewater treatment, and a marine terminal. This PAL permit contains the PALs for seven pollutants and requirements that ensure Limetree’s compliance with the PAL. Initial PAL Permit

Final Permit

Letter to Citizen

Response to Comments

Application and Supporting Documentation – Docket on Regulations.com

12/02/2020

Limetree Bay Terminals and Limetree Bay Refining

St. Croix, VI

The Limetree Bay Terminals and Limetree Bay Refining facility (“Limetree”) is a complex, integrated petroleum refinery consisting of refinery process units and various supporting operations including sulfur recovery plants, steam and electric power generation via boilers and gas turbine cogeneration units, wastewater treatment, and a marine terminal.  

03/25/2021 Withdrawal of PAL Permit Issued on 12/02/2020

Administrator’s Letter to Governor Bryan

EPA Fact Sheet on LTB

Withdrawn

Limetree Bay Terminals and Limetree Bay Refining

St. Croix, VI

The Limetree Bay Terminals and Limetree Bay Refining facility (“Limetree”) is a complex, integrated petroleum refinery consisting of refinery process units and various supporting operations including sulfur recovery plants, steam and electric power generation via boilers and gas turbine cogeneration units, wastewater treatment, and a marine terminal. Motion to enter the first modification to a 2011 consent decree with HOVENSA L.L.C., the prior owner of the Limetree Bay facility (not directly related to PAL permit)

Motion to Enter

Clean Air Act “request for information” letter 

2011 consent decree with HOVENSA

04/08/2021

Pending Plantwide Applicability Limitation (PAL) Permits

Facility and Location Facility Type/Project Description Permit Type Comment Period End Date Related Documents
No Pending PAL Permits at this time

Part 71 Permits (issued since 2000)

Facility and Location Facility Type/Project Description Permit Type Permit Documents Issued
Philadelphia Furniture Manufacturing Company
Salamanca (Tribal Area), NY
Furniture Manufacturing/Furniture Manufacturing Processes/NSPS affected and non-affected boilers. Initial Final Permit (PDF, 253kb) 11/01/2001
Philadelphia Furniture, LLC
Salamanca (Tribal Area), NY
Furniture Manufacturing/Furniture Manufacturing Processes; NSPS affected and non-affected boilers.

The permit was amended to reflect the transfer in ownership of the renewed Title V Permit from Philadelphia Furniture Manufacturing Company to Philadelphia Furniture, LLC)
Renewal and Amendment Final Permit (PDF, 424kb) 8/27/2007
Turning Stone Casino and Resort
Verona (Tribal Area), NY
Recreational Facility: NSPS affected combined-cycle natural gas combustion turbine and natural gas steam boilers; NESHAP affected diesel emergency generators. Renewal Final Permit (PDF, 166kb) 7/5/2011
Turning Stone Casino and Resort
Verona (Tribal Area), NY
The permit was modified to reflect the (1) addition of three new emergency generators; (2) inclusion of the applicable requirements pursuant to NSPS IIII, NSPS JJJJ, NESHAP ZZZZ, and Section 184 of the CAA, which pertains to the Ozone Transport Region; and (3) removal of an existing backup diesel generator. Modification Final Permit (PDF, 15mb) 2/4/2015

Turning Stone Casino and Resort
Verona (Tribal Area), NY

The permit was modified to reflect the (1) removal of the existing Onan 500DEFG backup diesel generator; and (2) addition of a Caterpillar 3412 C backup diesel generator. Modification Final Permit 3/8/2017

Turning Stone Casino and Resort

Verona (Tribal Area), NY

Recreational Facility: NSPS affected combined-cycle natural gas combustion turbine and natural gas steam boilers; NESHAP affected diesel emergency generators. Renewal

Final Permit

Statement of Basis

November 6, 2020

Pending Part 71 Permits

Facility and Location Facility Type/Project Description Permit Type Comment Period End Date Related Documents

Ocean County Landfill Corporation and MRPC Holdings, LLC

Manchester Township, Ocean County, New Jersey

Municipal Solid Waste Landfill and Landfill Gas to Energy Operations Initial CLOSED Related Documents

Outer Continental Shelf (OCS) Permits

Facility and Location Facility Type/Project Description Permit Type Permit Documents Issued
Ocean Wind, LLC OCS Source - Meteorological Buoys Project located in the OCS waters of the Atlantic Ocean within 25 nautical miles offshore New Jersey Initial OCS Air Permit to Construct and Operate

Final Permit

Fact Sheet

11/5/2018
Ocean Wind, LLC

OCS Source - Meteorological Buoys Project located in the OCS waters of the Atlantic Ocean within 25 nautical miles offshore New Jersey

Minor Modification to OCS Air Permit to Construct and Operate

Final Permit

07/19/2019

Empire Offshore Wind, LLC, Empire Wind Project Located within the Outer Continental Shelf (OCS) at approximately 12 nautical miles (14 statute miles) south of Long Island, New York (“NY”) and 17 nautical miles (19.5 statute miles) east of Long Branch, New Jersey     OCS Source – Wind to Energy Project, including up to 147 wind turbines generators, two offshore substations, and inter-array cables. The wind turbine generators use the energy of the wind, a source of renewable energy, and convert it to electricity.         Initial OCS Air Permit to Construct and Operate     

Cover Letter Permit (pdf) (674.36 KB)

Final Permit (pdf) (1.5 MB)

Response to Public Comments (pdf) (934.18 KB)

Administrative Record, available at docket number EPA-R02-OAR-2023-0522 at www. regulations.gov

       2/15/2024
Empire Offshore Wind, LLC, Empire Wind Project Located within the Outer Continental Shelf (OCS) at approximately 12 nautical miles (14 statute miles) south of Long Island, New York (“NY”) and 17 nautical miles (19.5 statute miles) east of Long Branch, New Jersey    OCS Source – Wind to Energy Project, including up to 147 wind turbines generators, two offshore substations, and inter-array cables. The wind turbine generators use the energy of the wind, a source of renewable energy, and convert it to electricity.         Administrative Permit Amendment 

Cover Letter (pdf) (277.41 KB)

Empire Wind OCS Air Permit (pdf) (872.91 KB)

ENCLOSURE I (pdf) (212.5 KB)

Administrative Amendment Request (pdf) (5.56 MB)

11/21/2024
Atlantic Shores Offshore Wind Project 1, LLC,  Atlantic Shores Project 1, and Project 2  located within the OCS at approximately 7.6 nautical miles (8.7 statute miles) east from the New Jersey shoreline.

OCS Source – Wind to Energy Project, including up to 200 wind turbines generators, up to 8 small, 5 medium, or 4 large offshore substations, and inter-array cables. The wind turbine generators use the energy of the wind, a source of renewable energy, and convert it to electricity.

Initial OCS Air Permit to Construct and Operate 

Cover Letter Permit (pdf) (251.63 KB)

Final Permit (pdf) (1.63 MB)

Response to Public Comments (pdf) (2.49 MB)

Administrative Record, available at docket number EPA-R02-OAR-2024-0312 

at www.regulations.gov

9/30/2024 

Pending OCS Permits

Facility and Location Facility Type/Project Description Permit Type Comment Period End Date and Public Hearing Related Documents
     

Deepwater Port Permits

Facility and Location Facility Type/Project Description Permit Type Permit Documents Issued
No Deepwater Port Permits have been issued by EPA Region 2

Pending PSD Permits

Facility and Location Facility Type/Project Description Permit Type Comment Period End Date Related Documents
                                                No Pending PSD Permits at this time.
Region 2

Region 2 CAA Permitting Focus

Region 2 CAA Permitting

  • CAA Permits Issued by EPA in Region 2
  • Environmental Justice in CAA Permitting
  • Title V Operating Permits Public Petitions Deadlines 
  • Title V Program Evaluations
  • Air Permit Delegations

National Supporting Resources

  • CAA Permitting Home
  • New Source Review (NSR) Program
  • Title V Program
  • Tribal Permit Program
  • Outer Continental ​Shelf Permit Program
  • CAA Permitting Tools & ​Related Resources
  • Air Permitting Terms
  • Where You Live

Air Permitting Policy & Guidance

  • Search Documents
  • NSR Policy & Guidance
  • Title V Policy & Guidance
  • Title V Petition Database
Contact Us About Permitting Under the Clean Air Act to ask a question, provide feedback, or report a problem.
Last updated on November 22, 2024
  • Assistance
  • Ayuda
  • Arabic
  • Chinese (simplified)
  • Chinese (traditional)
  • Aide
  • Asistans
  • Korean
  • Assistência
  • Russian
  • Tulong
  • Vietnamese
United States Environmental Protection Agency

Discover.

  • Accessibility Statement
  • Budget & Performance
  • Contracting
  • EPA www Web Snapshot
  • Grants
  • No FEAR Act Data
  • Plain Writing
  • Privacy
  • Privacy and Security Notice

Connect.

  • Data
  • Inspector General
  • Jobs
  • Newsroom
  • Regulations.gov
  • Subscribe
  • USA.gov
  • White House

Ask.

  • Contact EPA
  • EPA Disclaimers
  • Hotlines
  • FOIA Requests
  • Frequent Questions

Follow.